GAS TURBINE AUXILIARY POWER UNIT AND ENGINE TESTING

Results

-
GAS TURBINE AUXILIARY POWER UNIT AND ENGINE TESTING
GAS TURBINE AUXILIARY POWER UNIT AND ENGINE TESTING

HD Quiz powered by harmonic design

#1. Which of the following statements would be more correct with regard to an APU?

#2. In the event of a fire in an APU:

#3. Which of the following would result in an automatic shut down of an APU?

#4. A Ram Air Turbine is used to provide:

#5. The power to start an APU comes from:

Finish
GAS TURBINE AUXILIARY POWER UNIT AND ENGINE TESTING
Scroll to top